Plain answers · Published 28 Nov 2026

Clothing manufacturer FAQ: minimums, timing and prices in Portugal

Short, plain answers to what brands ask Portugal Clothing Factory, a group of clothing factories in northern Portugal, before a first order. Minimums start from 50-100 pieces per style and colour, flexible; a sample takes about 2 to 3 weeks; production takes 5 to 10 weeks after sample approval; and our team replies to every brief within 24 hours.

  • Free brief
  • Reply within 24h

Tech pack: one style, factory-ready, in 3-5 working days.

Factory floor with sewing lines and shipping boxes

A group of factories in northern Portugal

At a glance

The short answers

QuestionAnswer
Minimum orderFrom 50-100 pieces per style and colour, flexible
First sampleAbout 2 to 3 weeks (denim prototypes 3 to 6 weeks)
Production5 to 10 weeks after sample approval, by garment
Reply to a briefWithin 24 hours
Tech pack€79 per style, 3-5 working days
Minimums

Minimum order questions

What is your minimum order?

From 50-100 pieces per style and colour, flexible. The exact figure is agreed case by case with the factory in our group that makes your order, and it depends mostly on the fabric and the construction. See the low MOQ production page for how small first runs work.

Does each colour count separately, and can I mix sizes?

Each colour counts separately. Sizes can be mixed within a colour, so the pieces in one colour can be split across your size range. Our guide to MOQ explains why factories set minimums this way.

Can the fabric raise the minimum?

Yes. A custom dye lot or a special wash can mean the fabric has its own minimum, which raises the effective minimum for that style. We say so in the reply to your brief, before anything is ordered.

Timing

Timing questions

How fast do you reply to a brief?

Within 24 hours. Our team is in Porto and replies by email in English, German, French or Spanish.

How long does a sample take?

A first sample takes about 2 to 3 weeks. Denim prototypes take longer, about 3 to 6 weeks, because of the washes.

How long does production take?

5 to 10 weeks after you approve the sample, depending on the garment: jersey, hoodies and knitwear 5-7 weeks; shirts and dresses 6-8; activewear 7-9; denim, outerwear and tailoring 8-10. The full list is on our what we make page.

What does a first bulk order look like, from brief to delivery?

You send a brief, we reply within 24 hours, the tech pack is finished, the factory makes a first sample, you approve it, and production runs. Add the sample time (about 2 to 3 weeks) to the production time for your garment and you have a realistic plan from brief to goods ready to ship.

Prices and development

Price and tech pack questions

How is production priced?

The factory in our group that makes your order quotes in writing after it has a complete tech pack. There is no price list, because cost depends on fabric, trims and quantity. For a guide, our cost model puts a T-shirt at about €6-11 per piece and a hoodie at €14-24 at 300-500 units (ex-factory, excluding VAT); at 50-100 units, expect about 1.55 times that. Try the garment cost calculator for your own garment.

Do I need a tech pack before I can get a quote?

Yes, a complete tech pack is what the factory quotes from. If you don’t have one, our team writes it for €79 per style in 3-5 working days, with 2-3 revision rounds. Details are on the tech pack service page.

What do patterns, grading and 3D samples cost?

Each has a fixed price per style, shown on its own page: pattern making, pattern grading and the 3D sample in CLO3D. The tech pack comes first, and the pattern follows once the tech pack is approved.

Product and certificates

Product and certificate questions

What do your factories make, and what don't they?

Our factories make t-shirts and polos, hoodies and sweatshirts, knitwear, shirts and dresses, denim, outerwear, activewear and tailoring, plus uniforms, merch and private label. We don’t make bags, footwear or hard goods.

Can you make GOTS, OEKO-TEX or GRS certified garments?

Yes, through the factory in our group whose certificate covers the claim. Certificates are held in each factory’s own name; Portugal Clothing Factory itself is not certified, so ask for the certificate that covers your product and check it in the GOTS certified suppliers database or with the OEKO-TEX label check. See GOTS, OEKO-TEX and GRS.

Where are your factories?

In northern Portugal, around Porto, Guimarães, Barcelos and Braga. Portugal Clothing Factory is a group of clothing factories there, founded in 2021, with its team in Porto.

Not here?

Questions that depend on your product

Some answers change with the garment, the fabric and the factory, so we give them in the reply to your brief rather than as one number here. Send the product, the quantity per style and colour, and your date, and ask anything else in the same message.

Free brief · Step 1 of 5

What are you making?

Tick your product and a quantity. It takes two minutes, and our team in Porto replies within 24 hours.

Product (pick all that apply)
Units per style (optional)

Free brief · Reply within 24h