AQL inspection is a sampling check on a finished production lot. An inspector pulls a set number of garments at random, counts the defects against an agreed limit (the AQL), and passes the lot if the count stays at or below the acceptance number. For a 300-piece order at AQL 2.5, that means checking 50 pieces and accepting up to 3 defective ones.

Key takeaways

  • AQL is a limit, not a guarantee. MIL-STD-105D defines it as the maximum percent defective that can be considered satisfactory as a process average.
  • Lot size sets the sample. At the default General Level II, a 281-500 piece lot gets a 50-piece sample.
  • Small lots follow the arrows. A 50-piece lot at AQL 2.5 is checked on 5 pieces, with zero defective pieces allowed.
  • The spec sheet is the yardstick. An inspector can only fail what your tech pack defines.

What is AQL inspection?

AQL stands for acceptable quality level. MIL-STD-105D defines the AQL as "the maximum percent defective (or the maximum number of defects per hundred units)" that can be considered satisfactory as a process average. An AQL inspection applies that limit to a random sample instead of checking every garment in the lot.

The tables most inspectors use today come from that US military standard. The NIST Engineering Statistics Handbook notes that MIL-STD-105D was issued in 1963 and adopted in 1971 by the American National Standards Institute as ANSI Standard Z1.4. ISO 2859-1 belongs to the same family of attribute sampling tables, so a quote that says "AQL 2.5, Level II" reads the same way under all three.

One line in the standard is worth quoting to any supplier. Under section 4.4, naming an AQL "shall not imply that the supplier has the right to supply knowingly any defective unit of product". In plain terms: the AQL decides whether a lot is accepted. It doesn't give anyone permission to ship faults.

How does AQL sampling work, step by step?

AQL sampling works in six steps: fix the lot, find the code letter, choose the AQL, read the plan, pull the sample at random, then compare the defect count with the acceptance and rejection numbers. The standard uses the code letter and the AQL together to pick the plan, so you need both before anyone opens a carton.

  1. Define the lot. Under MIL-STD-105D, a lot should consist of units of a single type, grade, class, size and composition, made under essentially the same conditions. For clothing, that usually means one style in one colour from one production run.
  2. Find the code letter. Table I turns the lot size into a sample size code letter. Unless the order says otherwise, use Inspection Level II.
  3. Choose the AQL. Write it in the order or contract, often a different value for each class of defect.
  4. Read the plan. Table II-A (single sampling, normal inspection) gives the sample size, the acceptance number (Ac) and the rejection number (Re) for that letter and AQL.
  5. Pull the sample at random. The standard says sample units are selected at random, without regard to their quality. Take pieces from different cartons and sizes, not the top layer of one box.
  6. Count and decide. If defectives are at or below Ac, accept the lot. At or above Re, reject it.

Here's the part buyers often miss. When the table has no plan for a letter and AQL, it shows an arrow, and the standard says the user is directed to a different letter. That's why a small lot can end up with a smaller or a larger sample than its own letter suggests.

How many pieces are checked in a 50, 100, 300 or 500-piece order?

At General Inspection Level II, a 50-piece lot is code letter D, a 100-piece lot is F (20 pieces), and lots of 300 or 500 pieces are both H (50 pieces). We read the table below from MIL-STD-105D Tables I and II-A, single sampling, normal inspection, with the arrows applied for the smallest lot.

Lot size (one style and colour)Code letter (Level II)AQL 2.5: sample, accept / rejectAQL 4.0: sample, accept / reject
50 pieces (lot 26-50)D5 pieces, 0 / 1 (arrow up to C)13 pieces, 1 / 2 (arrow down to E)
100 pieces (lot 91-150)F20 pieces, 1 / 220 pieces, 2 / 3
300 pieces (lot 281-500)H50 pieces, 3 / 450 pieces, 5 / 6
500 pieces (lot 281-500)H50 pieces, 3 / 450 pieces, 5 / 6
1,000 pieces (lot 501-1,200)J80 pieces, 5 / 680 pieces, 7 / 8

Source: MIL-STD-105D (29 April 1963), Table I (sample size code letters) and Table II-A (single sampling plans for normal inspection). ANSI/ASQ Z1.4 and ISO 2859-1 use the same table layout.

Two things stand out at small-brand volumes. First, 300 and 500 pieces get exactly the same check, because both sit in the 281-500 band. Second, the 50-piece lot is a special case. At AQL 2.5 the arrow sends you up to letter C, so only 5 pieces are checked and a single defective fails the lot. At AQL 4.0 the arrow points down to E, and 13 pieces are checked.

So does a smaller order mean a looser check? Not really. With 5 pieces and zero allowed defectives, one bad garment decides the result. The standard has an answer for the two different sample sizes, too. Under section 9.4, the code letter that gives the largest sample may be used for all classes of defects when the buyer approves it, so you can check 13 pieces for both. The same section allows a plan with an acceptance number of 1 and its larger sample in place of a zero-acceptance plan.

AQL sampling table: Level II chart for lots up to 3,200 pieces

This AQL chart covers General Inspection Level II, single sampling, normal inspection, for lots of 2 to 3,200 pieces at AQL 1.5, 2.5 and 4.0. Each cell gives the sample size, then the acceptance and rejection numbers, with the table's arrows already applied.

Lot sizeCode letterAQL 1.5: sample, Ac / ReAQL 2.5: sample, Ac / ReAQL 4.0: sample, Ac / Re
2-8A8, 0 / 1 (down to D)5, 0 / 1 (down to C)3, 0 / 1 (down to B)
9-15B8, 0 / 1 (down to D)5, 0 / 1 (down to C)3, 0 / 1
16-25C8, 0 / 1 (down to D)5, 0 / 13, 0 / 1 (up to B)
26-50D8, 0 / 15, 0 / 1 (up to C)13, 1 / 2 (down to E)
51-90E8, 0 / 1 (up to D)20, 1 / 2 (down to F)13, 1 / 2
91-150F32, 1 / 2 (down to G)20, 1 / 220, 2 / 3
151-280G32, 1 / 232, 2 / 332, 3 / 4
281-500H50, 2 / 350, 3 / 450, 5 / 6
501-1,200J80, 3 / 480, 5 / 680, 7 / 8
1,201-3,200K125, 5 / 6125, 7 / 8125, 10 / 11

Source: MIL-STD-105D, Table I (sample size code letters, General Inspection Level II) and Table II-A (single sampling plans for normal inspection). Ac = accept, Re = reject.

One rule from the table's own key matters for the smallest lots: if the sample size equals or exceeds the lot size, do 100 percent inspection. A 4-piece lot with an 8-piece plan simply means checking all 4.

What do critical, major and minor defects mean for a garment?

MIL-STD-105D sorts defects into three classes by seriousness: critical (likely to cause hazardous or unsafe conditions), major (likely to cause failure or materially reduce usability) and minor (not likely to reduce usability materially). Each class can carry its own AQL, which is why one order often lists two or three values.

ClassDefinition (MIL-STD-105D, section 2)Garment examples
CriticalLikely to result in hazardous or unsafe conditions for the userBroken needle or metal fragment left in the garment, a loose snap or small part on kidswear
MajorLikely to result in failure, or to reduce materially the usability of the productOpen seam, hole, measurement outside tolerance, wrong size label, stain on the front
MinorNot likely to reduce usability materially; a departure with little bearing on useUntrimmed thread end, small uneven topstitch on an inside seam, slight crease from packing

Critical defects get special treatment in the standard itself. Section 6.3 lets the buyer require the supplier to inspect every unit for critical defects, and to reject a lot when one is found. That's why buyers usually check safety items on every piece rather than by AQL.

A common way to write the major and minor limits on an apparel order is AQL 2.5 for major defects and AQL 4.0 for minor ones, which is the pair used in the table above. Nothing in the standard fixes that pair, though. It's a choice you and the factory agree on, and it belongs in writing.

What does an inspector check on a finished garment?

An inspector checks each sampled garment against the approved sample and the spec sheet: measurements, workmanship, fabric, trims, labels and packing. The standard describes inspection as comparing the unit of product with the requirements, so the result is only as precise as the requirements you send.

Two hands folding back the ribbed hem of a white sweatshirt to check the rib and seam
Rib hems, cuffs and seam joins are among the first places an inspector looks.
AreaWhat gets checkedWhere the standard comes from
MeasurementsKey points of measure on several sizes, within toleranceSize chart and tolerances in the tech pack
Seams and stitchingOpen or skipped stitches, puckering, stitch density, overlock coverageConstruction notes and approved sample
FabricHoles, slubs, shading between panels, stainsFabric spec and approved lab dip or bulk swatch
Print and embroideryPosition, size, cracking, loose threadsArtwork and print position page
Trims and closuresZips, drawcords, snaps and eyelets working and secureBill of materials
LabelsBrand, size and care labels correct and in placeLabel and packaging page
Pressing and packingFolding, poly bags, carton count and size breakdownPacking instructions

Notice the right-hand column. Every line points back to a document. If the tech pack doesn't give a tolerance for chest width, there's nothing to fail. That's the practical reason a factory-ready tech pack matters as much for inspection as for sampling.

What does AQL 2.5 actually mean?

AQL 2.5 means a process average of 2.5% defective is treated as acceptable, and the sampling plan will accept most lots from a process running at or below that level. It doesn't mean every lot may contain exactly 2.5% faulty pieces, and it doesn't promise any single lot is that good.

The standard says it directly in section 4.3: the AQL alone does not describe the protection for individual lots, and relates more to what can be expected from a series of lots. Take the 300-piece example. The plan checks 50 pieces. Three defectives pass, four fail. Three out of 50 is 6% of the sample, well above 2.5%, and the lot still passes. That's how attribute sampling is built, not a loophole.

A lower number is stricter. AQL 1.5 allows fewer defectives for the same sample than 2.5, and AQL 4.0 allows more. If you want tighter control on one point, such as measurements, give it its own lower AQL instead of tightening everything.

When should a small brand inspect, and what happens if a lot fails?

The AQL check is a final inspection, done when the lot is finished and mostly packed, so problems show up before the cartons leave. Earlier checks during sampling and the first pieces off the line catch issues while they're still cheap to fix.

Workers sorting finished garments along a long table in a factory
When a lot fails, the usual next step is a full sort before it is checked again.

If a lot fails, the standard is clear on the order of events. Under section 6.4, a rejected lot is resubmitted only after all units are re-examined and all defective units are removed or corrected. In practice that means a full sort, repairs where possible, then a new inspection. Agree who pays for that sort before production starts.

On orders made in our group, quality control is handled by our team across the run, so problems are caught before the boxes close. If you need a written AQL on your order, put the values and the inspection level in your brief, so they're agreed before production starts. Our guide to quality control in Portuguese clothing production covers the checks before the final one.

Lot size ties back to your order size, too. Our minimum is from 50-100 pieces per style and colour, flexible, which is why the 50 and 100-piece rows in the table matter most for low MOQ production. If you're unsure how a minimum is counted, see what MOQ means.

Frequently asked questions

What is the AQL 2.5 standard?

AQL 2.5 is an acceptable quality level of 2.5% defective, used with the sampling tables in ANSI/ASQ Z1.4, ISO 2859-1 or MIL-STD-105D. At General Level II, a 300-piece lot is checked on 50 pieces and passes with up to 3 defectives.

What does 1.5 AQL mean?

AQL 1.5 is a stricter limit than 2.5. For a 281-500 piece lot at Level II, the sample is still 50 pieces, but the plan accepts up to 2 defectives and rejects at 3.

How do you calculate the AQL sample size?

Take the lot size, find the code letter in Table I (Level II unless agreed otherwise), then read the sample size and accept/reject numbers for your AQL in Table II-A. If the cell shows an arrow, use the first plan the arrow points to.

Should critical defects have an AQL of zero?

You can set it that way. MIL-STD-105D section 6.3 lets the buyer require every unit to be inspected for critical defects and to reject a lot when one is found.

What is General Inspection Level II?

It's the default level in the standard: "Unless otherwise specified, Inspection Level II will be used." Level I checks fewer pieces, Level III more, and four special levels (S-1 to S-4) are for cases where small samples are necessary.

In short: AQL inspection checks a random sample against agreed limits. Fix the lot per style and colour, write the AQL and level on the order, and give the inspector a spec sheet that defines every tolerance.

Planning a first production run?

Send us your styles, quantities and the quality limits you need. Our team replies within 24 hours.

Get in contact Get a tech pack (€79)

No spec yet? A tech pack gives the inspector measurements and tolerances to check against.

Sources

  1. US Department of Defense, MIL-STD-105D, Sampling Procedures and Tables for Inspection by Attributes (29 April 1963), sections 1-10, Table I and Table II-A (read 28 November 2026).
  2. NIST/SEMATECH, Engineering Statistics Handbook, choosing a sampling plan: MIL Standard 105D (read 28 November 2026).